Join them for an exclusive event to unveil their state-of-the-art facility, featuring a cutting-edge 200kW solar powered microgrid. Discover the innovative off-grid, islanded power system designed, manufactured, installed, and interconnected by Hodges Electric, Lean Solar, and Intertie. This pioneering project, the first of its kind in the San Joaquin Valley, sets a new standard for sustainable industrial energy solutions.
Please RSVP to Nemat Inc. by June 11, 2024 (559.474.4315 or [email protected])